Interface Register
Log interfaces between packages, contractors, utilities and authorities; track who leads, when agreement is needed and what is still open; and see where interface risk concentrates.
- Interfaces
- 0
- Open
- 0
- High criticality open
- 0
- Overdue
- 0
Register

Nothing here yet. Let's build something.
Add your first interface, import a CSV, or load three generic example entries to see how the register and matrix work.
Good register practice
Name both sides
Every interface has two parties and one lead. If you cannot name both, it is a scope question, not an interface yet.
Tie it to a need date
Use the date the downstream party needs the agreed information (e.g. to release a design or a work front), not an arbitrary target.
Close on evidence
Close only against an agreed interface control document, form or minuted agreement — the tool requires a reference before closing.
Need a project-wide, multi-user register with workflows and audit trail? See CONSTRENEX Interface Management.